Report for the project Sorry, this article was not found on the server! for the period from 01.01.2012 to 31.12.2012
Total sum: 38 763 USD
| # | Date: ⇅ | Name: ⇅ | Sum: ⇅ |
|---|---|---|---|
| 1 | 17.11.2023 | Alexander P. (USA) | $184.73 |
| 2 | 12.10.2023 | Alexander P. (USA) | $94.14 |
| 3 | 14.08.2023 | Alexander P. (USA) | $93.04 |
| 4 | 13.07.2023 | Alexander P. (USA) | $91.9 |
| 5 | 05.06.2023 | Alexander P. (USA) | $94.98 |
| 6 | 14.05.2023 | Alexander P. (USA) | $93.63 |
| 7 | 28.02.2023 | Valentina B. (Ukraine) | $11.49 |
| 8 | 11.02.2023 | Yaroslav H. (Ukraine) | $13.68 |
| 9 | 06.02.2023 | M***** LTD (Las Vegas, USA) | $101.2 |
| 10 | 02.01.2023 | M***** LTD (Las Vegas, USA) | $101.2 |
| 11 | 15.12.2022 | Yaroslav G. (Ukraine) | $13.68 |
| 12 | 07.12.2022 | M***** LTD (Las Vegas, USA) | $101.2 |
| 13 | 10.10.2022 | M***** LTD (Las Vegas, USA) | $101.2 |
| 14 | 02.09.2022 | M***** LTD (Las Vegas, USA) | $205.14 |
| 15 | 05.08.2022 | M***** LTD (Las Vegas, USA) | $98.47 |
| 16 | 06.06.2022 | M***** LTD (Las Vegas, USA) | $100.51 |
| 17 | 04.05.2022 | M***** LTD (Las Vegas, USA) | $100.51 |
| 18 | 03.04.2022 | M***** LTD (Las Vegas, USA) | $100.31 |
| 19 | 10.03.2022 | M***** LTD (Las Vegas, USA) | $100.29 |
| 20 | 05.02.2022 | M***** LTD (Las Vegas, USA) | $98.6 |
| 21 | 23.01.2022 | M***** LTD (Las Vegas, USA) | $98.41 |
| 22 | 15.12.2021 | M***** LTD (Las Vegas, USA) | $99.48 |
| 23 | 24.11.2021 | Children s Eco Village (transfer) | $81.46 |
| 24 | 22.10.2021 | Donation box (Dnipro, Ukraine) | $1.9 |
| 25 | 21.10.2021 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $118 |
| 26 | 21.10.2021 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $19.03 |
| 27 | 21.10.2021 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $11.42 |
| 28 | 21.10.2021 | Children s Eco Village (transfer) | $45.68 |
| 29 | 06.10.2021 | M***** LTD (Las Vegas, USA) | $98.68 |
| 30 | 15.09.2021 | Children s Eco Village (transfer) | $104.95 |
| 31 | 02.09.2021 | M***** LTD (Las Vegas, USA) | $97.24 |
| 32 | 02.08.2021 | M***** LTD (Las Vegas, USA) | $97.91 |
| 33 | 28.07.2021 | Children s Eco Village (transfer) | $26.02 |
| 34 | 28.07.2021 | Children s Eco Village (transfer) | $55.75 |
| 35 | 28.07.2021 | Children s Eco Village (transfer) | $70.62 |
| 36 | 28.07.2021 | Children s Eco Village (transfer) | $40.88 |
| 37 | 28.07.2021 | Children s Eco Village (transfer) | $48.32 |
| 38 | 09.06.2021 | Children s Eco Village (transfer) | $14.78 |
| 39 | 16.04.2021 | Children s Eco Village (transfer) | $324.15 |
| 40 | 01.04.2021 | Children s Eco Village (transfer) | $198.82 |
| 41 | 18.03.2021 | Children s Eco Village (transfer) | $397.14 |
| 42 | 18.03.2021 | Children s Eco Village (transfer) | $58.49 |
| 43 | 25.02.2021 | Children s Eco Village (transfer) | $35.78 |
| 44 | 25.02.2021 | Children s Eco Village (transfer) | $143.12 |
| 45 | 04.02.2021 | Children s Eco Village (transfer) | $35.72 |
| 46 | 04.02.2021 | Children s Eco Village (transfer) | $71.44 |
| 47 | 06.01.2021 | Children s Eco Village (transfer) | $52.81 |
| 48 | 30.12.2020 | Children s Eco Village (transfer) | $17.69 |
| 49 | 26.12.2020 | Children s Eco Village (transfer) | $386.54 |
| 50 | 24.12.2020 | ttaannyy (Ukraine) | $102.53 |
| 51 | 21.12.2020 | Children s Eco Village (transfer) | $39.03 |
| 52 | 11.12.2020 | Ivan S. (Ukraine) | $249.33 |
| 53 | 09.12.2020 | Children s Eco Village (transfer) | $29.84 |
| 54 | 12.11.2020 | Children s Eco Village (transfer) | $5.1 |
| 55 | 23.10.2020 | Children s Eco Village (transfer) | $0.11 |
| 56 | 23.10.2020 | Children s Eco Village (transfer) | $155.67 |
| 57 | 23.10.2020 | Children s Eco Village (transfer) | $3.54 |
| 58 | 21.10.2020 | Special project S.O.S. (transfer) | $352.41 |
| 59 | 28.09.2020 | Children s Eco Village (transfer) | $173.41 |
| 60 | 28.09.2020 | Children s Eco Village (transfer) | $0.07 |
| 61 | 28.09.2020 | Children s Eco Village (transfer) | $70.75 |
| 62 | 15.09.2020 | ttaannyy (Ukraine) | $3.47 |
| 63 | 19.08.2020 | Special project S.O.S. (transfer) | $183.62 |
| 64 | 11.08.2020 | Special project ALLIANCE (transfer) | $264.46 |
| 65 | 11.08.2020 | Children s Eco Village (transfer) | $137.55 |
| 66 | 11.08.2020 | Special project S.O.S. (transfer) | $180.84 |
| 67 | 04.08.2020 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $72.62 |
| 68 | 23.07.2020 | Chernihiv Psychoneurological Boarding School (v. Kalinovka) (transfer) | $0.08 |
| 69 | 10.07.2020 | Children s Eco Village (transfer) | $22.13 |
| 70 | 08.07.2020 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $16.56 |
| 71 | 03.07.2020 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $39.73 |
| 72 | 03.07.2020 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $8.68 |
| 73 | 24.06.2020 | Children s Eco Village (transfer) | $96.59 |
| 74 | 16.06.2020 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $72.49 |
| 75 | 16.06.2020 | Children s Eco Village (transfer) | $0.07 |
| 76 | 25.02.2020 | Children s Eco Village (transfer) | $12.6 |
| 77 | 21.02.2020 | Children s Eco Village (transfer) | $204.27 |
| 78 | 14.02.2020 | Children s Eco Village (transfer) | $81.7 |
| 79 | 14.01.2020 | Children s Eco Village (transfer) | $20.98 |
| 80 | 27.12.2019 | Children s Eco Village (transfer) | $21.11 |
| 81 | 20.11.2019 | Children s Eco Village (transfer) | $206.58 |
| 82 | 08.11.2019 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $44.61 |
| 83 | 07.11.2019 | The project of assistance from the chain of stores Eva - Ukraine (transfer) | $45.14 |
| 84 | 07.11.2019 | Dental treatment for Sasha Z. (transfer) | $4.12 |
| 85 | 07.11.2019 | Dental treatment for Sasha Z. (transfer) | $0.06 |
| 86 | 07.10.2019 | Children s Eco Village (transfer) | $41.24 |
| 87 | 01.08.2019 | Children s Eco Village (transfer) | $124.58 |
| 88 | 26.07.2019 | Children s Eco Village (transfer) | $48.02 |
| 89 | 24.06.2019 | Children s Eco Village (transfer) | $156.85 |
| 90 | 06.06.2019 | Children s Eco Village (transfer) | $7.58 |
| 91 | 17.05.2019 | Dental treatment for Sasha Z. (transfer) | $164.1 |
| 92 | 17.05.2019 | Children s Eco Village (transfer) | $31.28 |
| 93 | 03.05.2019 | Children s Eco Village (transfer) | $9.98 |
| 94 | 25.03.2019 | Children s Eco Village (transfer) | $313.38 |
| 95 | 22.02.2019 | Children s Eco Village (transfer) | $20.33 |
| 96 | 14.09.2018 | Children s Eco Village (transfer) | $373.31 |
| 97 | 22.08.2018 | Endowment - reserve fund (transfer) | $1624 |
| 98 | 31.05.2018 | Children s Eco Village (transfer) | $9.57 |
| 99 | 08.05.2018 | Children s Eco Village (transfer) | $11.4 |
| 100 | 04.05.2018 | Children s Eco Village (transfer) | $302.71 |
| 101 | 27.04.2018 | Children s Eco Village (transfer) | $19.44 |
| 102 | 12.04.2018 | Children s Eco Village (transfer) | $50.07 |
| 103 | 10.04.2018 | Children s Eco Village (transfer) | $167.63 |
| 104 | 30.12.2017 | Nadezhda O. (Ukraine) | $1.78 |
| 105 | 07.08.2017 | Children s Eco Village (transfer) | $8.53 |
| 106 | 03.05.2017 | Children s Eco Village (transfer) | $38.04 |
| 107 | 05.12.2016 | Children s Eco Village (transfer) | $71.74 |
| 108 | 23.08.2016 | Special project S.O.S. (transfer) | $395.85 |
| 109 | 23.08.2016 | Special project S.O.S. (transfer) | $313.51 |
| 110 | 23.08.2016 | Special project S.O.S. (transfer) | $316.68 |
| 111 | 23.08.2016 | Special project S.O.S. (transfer) | $79.17 |
| 112 | 09.08.2016 | Children s Eco Village (transfer) | $34.23 |
| 113 | 03.08.2016 | Children s Eco Village (transfer) | $26.63 |
| 114 | 12.04.2016 | Children s Eco Village (transfer) | $57.79 |
| 115 | 11.04.2016 | Children s Eco Village (transfer) | $25.85 |
| 116 | 16.03.2016 | Children s Eco Village (transfer) | $55.32 |
| 117 | 01.03.2016 | Children s Eco Village (transfer) | $7.38 |
| 118 | 25.02.2016 | Children s Eco Village (transfer) | $164.32 |
| 119 | 25.02.2016 | Children s Eco Village (transfer) | $27 |
| 120 | 22.02.2016 | Children s Eco Village (transfer) | $3.44 |
| 121 | 16.02.2016 | Zubritskaya Anna (Kyiv, Ukraine) | $19.03 |
| 122 | 11.02.2016 | Children s Eco Village (transfer) | $58.06 |
| 123 | 09.02.2016 | Children s Eco Village (transfer) | $22.77 |
| 124 | 09.02.2016 | Children s Eco Village (transfer) | $30.87 |
| 125 | 09.02.2016 | Children s Eco Village (transfer) | $46.31 |
| 126 | 09.02.2016 | Children s Eco Village (transfer) | $32.42 |
| 127 | 05.02.2016 | Children s Eco Village (transfer) | $35.39 |
| 128 | 29.01.2016 | Children s Eco Village (transfer) | $26.88 |
| 129 | 18.12.2015 | Children s Eco Village (transfer) | $115.81 |
| 130 | 18.12.2015 | Children s Eco Village (transfer) | $85.15 |
| 131 | 14.12.2015 | Children s Eco Village (transfer) | $52.02 |
| 132 | 09.11.2015 | Children s Eco Village (transfer) | $53.55 |
| 133 | 09.11.2015 | Children s Eco Village (transfer) | $46.57 |
| 134 | 04.11.2015 | Children s Eco Village (transfer) | $21.75 |
| 135 | 28.10.2015 | Children s Eco Village (transfer) | $53.16 |
| 136 | 27.10.2015 | Children s Eco Village (transfer) | $17.72 |
| 137 | 21.10.2015 | Children s Eco Village (transfer) | $89.21 |
| 138 | 21.10.2015 | Children s Eco Village (transfer) | $239.84 |
| 139 | 20.10.2015 | Children s Eco Village (transfer) | $373.99 |
| 140 | 09.10.2015 | Children s Eco Village (transfer) | $234.75 |
| 141 | 06.10.2015 | Children s Eco Village (transfer) | $80.13 |
| 142 | 20.09.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.31 |
| 143 | 18.09.2015 | Valentina Т. (Zaporizhzhia, Ukraine) | $9.22 |
| 144 | 18.09.2015 | Leonid Е. (Odesa, Ukraine) | $23.04 |
| 145 | 16.09.2015 | Children s Eco Village (transfer) | $147.29 |
| 146 | 15.09.2015 | Children s Eco Village (transfer) | $38.25 |
| 147 | 15.09.2015 | Children s Eco Village (transfer) | $53 |
| 148 | 20.08.2015 | Charitable donation (transfer) | $10.53 |
| 149 | 20.08.2015 | Children s Eco Village (transfer) | $17.22 |
| 150 | 20.08.2015 | Children s Eco Village (transfer) | $424.95 |
| 151 | 20.08.2015 | Charitable donation (transfer) | $46.22 |
| 152 | 18.08.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.24 |
| 153 | 07.08.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.51 |
| 154 | 05.08.2015 | Charitable donation (transfer) | $18.93 |
| 155 | 29.07.2015 | Children s Eco Village (transfer) | $30.17 |
| 156 | 28.07.2015 | Children s Eco Village (transfer) | $27.18 |
| 157 | 28.07.2015 | Children s Eco Village (transfer) | $31.96 |
| 158 | 28.07.2015 | Children s Eco Village (transfer) | $95.59 |
| 159 | 28.07.2015 | Charitable donation (transfer) | $50.77 |
| 160 | 28.07.2015 | Children s Eco Village (transfer) | $133.64 |
| 161 | 28.07.2015 | Children s Eco Village (transfer) | $15.86 |
| 162 | 22.07.2015 | Children s Eco Village (transfer) | $9.08 |
| 163 | 22.07.2015 | Children s Eco Village (transfer) | $90.82 |
| 164 | 22.07.2015 | Children s Eco Village (transfer) | $34.18 |
| 165 | 21.07.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.13 |
| 166 | 15.07.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.17 |
| 167 | 08.07.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $18.94 |
| 168 | 06.07.2015 | Children s Eco Village (transfer) | $43.77 |
| 169 | 06.07.2015 | Children s Eco Village (transfer) | $117.99 |
| 170 | 06.07.2015 | Charitable donation (transfer) | $140.02 |
| 171 | 06.07.2015 | Children s Eco Village (transfer) | $137.03 |
| 172 | 06.07.2015 | Children s Eco Village (transfer) | $89.54 |
| 173 | 06.07.2015 | Children s Eco Village (transfer) | $76.13 |
| 174 | 06.07.2015 | Children s Eco Village (transfer) | $71.37 |
| 175 | 06.07.2015 | Anonymous donor (Ukraine) | $542.39 |
| 176 | 06.07.2015 | Anonymous donor (Ukraine) | $1046.72 |
| 177 | 01.07.2015 | Children s Eco Village (transfer) | $80.05 |
| 178 | 01.07.2015 | Anonymous donor (Ukraine) | $380.86 |
| 179 | 01.07.2015 | Children s Eco Village (transfer) | $4.76 |
| 180 | 23.06.2015 | Mission Ukraine (USA) | $5884 |
| 181 | 17.06.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.54 |
| 182 | 09.06.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $47.06 |
| 183 | 04.06.2015 | Development of websites and software (transfer) | $14.23 |
| 184 | 04.06.2015 | Development of websites and software (transfer) | $4.51 |
| 185 | 04.06.2015 | Development of websites and software (transfer) | $11.67 |
| 186 | 03.06.2015 | Development of websites and software (transfer) | $227.37 |
| 187 | 03.06.2015 | Development of websites and software (transfer) | $279.35 |
| 188 | 02.06.2015 | Development of websites and software (transfer) | $70.9 |
| 189 | 02.06.2015 | Development of websites and software (transfer) | $112.33 |
| 190 | 02.06.2015 | Development of websites and software (transfer) | $142.28 |
| 191 | 02.06.2015 | Development of websites and software (transfer) | $23.71 |
| 192 | 02.06.2015 | Development of websites and software (transfer) | $19.73 |
| 193 | 02.06.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.53 |
| 194 | 20.05.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.61 |
| 195 | 13.05.2015 | Development of websites and software (transfer) | $87.42 |
| 196 | 13.05.2015 | Mission Ukraine (USA) | $2900.01 |
| 197 | 06.05.2015 | Mission Ukraine (USA) | $1100 |
| 198 | 05.05.2015 | Children s Eco Village (transfer) | $300.49 |
| 199 | 05.05.2015 | Children s Eco Village (transfer) | $172.67 |
| 200 | 28.04.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $8.92 |
| 201 | 22.04.2015 | Children s Eco Village (transfer) | $155.79 |
| 202 | 22.04.2015 | Children s Eco Village (transfer) | $88.97 |
| 203 | 22.04.2015 | Children s Eco Village (transfer) | $51.68 |
| 204 | 20.04.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $9.54 |
| 205 | 20.04.2015 | Children s Eco Village (transfer) | $114.95 |
| 206 | 16.04.2015 | Children s Eco Village (transfer) | $44.53 |
| 207 | 14.04.2015 | Zubritskaya Anna (Kyiv, Ukraine) | $8.55 |
| 208 | 10.04.2015 | Children s Eco Village (transfer) | $374.3 |
| 209 | 10.04.2015 | Children s Eco Village (transfer) | $346.66 |
| 210 | 10.04.2015 | Children s Eco Village (transfer) | $265.42 |
| 211 | 09.04.2015 | Children s Eco Village (transfer) | $219.56 |
| 212 | 09.04.2015 | Children s Eco Village (transfer) | $226.5 |
| 213 | 09.04.2015 | Children s Eco Village (transfer) | $13.7 |
| 214 | 07.04.2015 | Children s Eco Village (transfer) | $414.73 |
| 215 | 07.04.2015 | Children s Eco Village (transfer) | $222.97 |
| 216 | 07.04.2015 | Children s Eco Village (transfer) | $751.32 |
| 217 | 07.04.2015 | Children s Eco Village (transfer) | $55.3 |
| 218 | 07.04.2015 | Children s Eco Village (transfer) | $86.77 |
| 219 | 31.03.2015 | Children s Eco Village (transfer) | $540.23 |
| 220 | 31.03.2015 | Children s Eco Village (transfer) | $257.65 |
| 221 | 19.03.2015 | Children s Eco Village (transfer) | $193.62 |
| 222 | 19.03.2015 | Children s Eco Village (transfer) | $139.87 |
| 223 | 16.03.2015 | Children s Eco Village (transfer) | $160.99 |
| 224 | 16.03.2015 | Children s Eco Village (transfer) | $136.01 |
| 225 | 16.03.2015 | Children s Eco Village (transfer) | $111.03 |
| 226 | 12.03.2015 | Children s Eco Village (transfer) | $174.7 |
| 227 | 12.03.2015 | Children s Eco Village (transfer) | $5.2 |
| 228 | 11.03.2015 | Children s Eco Village (transfer) | $187.8 |
| 229 | 11.03.2015 | Children s Eco Village (transfer) | $147.7 |
| 230 | 10.03.2015 | Children s Eco Village (transfer) | $69.88 |
| 231 | 02.03.2015 | Children s Eco Village (transfer) | $112.81 |
| 232 | 25.02.2015 | Children s Eco Village (transfer) | $178.28 |
| 233 | 24.02.2015 | Children s Eco Village (transfer) | $249.81 |
| 234 | 24.02.2015 | Children s Eco Village (transfer) | $231.88 |
| 235 | 23.02.2015 | Children s Eco Village (transfer) | $101.56 |
| 236 | 20.02.2015 | Development of websites and software (transfer) | $260.24 |
| 237 | 20.02.2015 | Children s Eco Village (transfer) | $50.8 |
| 238 | 16.02.2015 | Children s Eco Village (transfer) | $518.47 |
| 239 | 16.02.2015 | Children s Eco Village (transfer) | $504.88 |
| 240 | 13.02.2015 | Children s Eco Village (transfer) | $64.11 |
| 241 | 13.02.2015 | Children s Eco Village (transfer) | $31.25 |
| 242 | 13.02.2015 | Children s Eco Village (transfer) | $18.03 |
| 243 | 12.02.2015 | Children s Eco Village (transfer) | $199.17 |
| 244 | 11.02.2015 | Children s Eco Village (transfer) | $614.29 |
Total sum: 40 613 USD
| # | Date: | Expenses: | Sum: |
|---|---|---|---|
| 1 | 05.09.2023 | bank commission 09.2023 | $0.14 |
| 2 | 04.09.2023 | To meet the economic needs of the operation of a family-type children s home | $93.03 |
| 3 | 26.07.2023 | bank commission 07.2023 | $0.14 |
| 4 | 26.07.2023 | To meet the economic needs of the operation of a family-type children s home | $91.88 |
| 5 | 07.07.2023 | bank commission 07.2023 | $0.14 |
| 6 | 07.07.2023 | To meet the economic needs of the operation of a family-type children s home | $94.97 |
| 7 | 22.05.2023 | bank commission 05.2023 | $0.08 |
| 8 | 22.05.2023 | To meet the economic needs of the operation of a family-type children s home | $136.73 |
| 9 | 13.03.2023 | bank commission 03.2023 | $0.08 |
| 10 | 13.03.2023 | Medicines, food products, basic necessities (Lilya T. family-type orphanage) | $181.07 |
| 11 | 20.01.2023 | Medicines, food, essentials (Lilia T. family-type orphanage, Mykhailivskyi district, Ukrainka village) | $245.57 |
| 12 | 16.11.2022 | Medicines, food, essentials (Lilia T. family-type orphanage, Mykhailivskyi district, Ukrainka village) | $16.41 |
| 13 | 10.10.2022 | Assistance for evacuation (Lilia T. family-type children s home, Mykhailivskyi district, Ukrainka village) | $287.2 |
| 14 | 13.07.2022 | Medicines, food, essentials (Lilia T. family-type orphanage, Mykhailivskyi district, Ukrainka village) | $273.5 |
| 15 | 27.06.2022 | Medicines, food, essentials | $209.57 |
| 16 | 10.06.2022 | Medicines, food, essentials (Lilia T. family-type orphanage, Mykhailivskyi district, Ukrainka village) | $273.5 |
| 17 | 16.05.2022 | Medicines, food, essentials | $341.88 |
| 18 | 05.05.2022 | Medicines, food, essentials | $341.88 |
| 19 | 16.02.2022 | Dental care for foster children | $212.45 |
| 20 | 26.01.2022 | Needs DDST | $140.97 |
| 21 | 06.01.2022 | Charity | $109.27 |
| 22 | 06.01.2022 | Boiler repair, medicines, travel assistance | $127.48 |
| 23 | 24.11.2021 | 4G router Huawei, shipping | $83.32 |
| 24 | 01.11.2021 | Medical care for children, procurement of medicines | $112.27 |
| 25 | 01.11.2021 | Travel | $26.64 |
| 26 | 01.11.2021 | replacement of hoses for the boiler | $11.42 |
| 27 | 01.11.2021 | chainsaw repair | $26.64 |
| 28 | 01.11.2021 | Gas boiler repair | $58.99 |
| 29 | 01.11.2021 | bank commission 11.2021 | $7.61 |
| 30 | 21.10.2021 | Repair of two washing machines | $45.68 |
| 31 | 21.10.2021 | Travel for household needs and repairs | $19.03 |
| 32 | 21.10.2021 | Chainsaw repair | $11.42 |
| 33 | 21.10.2021 | Materials and work - gate manufacturing | $118 |
| 34 | 21.10.2021 | Treatment of children | $99.92 |
| 35 | 21.10.2021 | bank commission 10.2021 | $7.61 |
| 36 | 15.09.2021 | Eye treatment in 2 children | $151.85 |
| 37 | 15.09.2021 | two children s desks with delivery | $104.96 |
| 38 | 15.09.2021 | visit to the dentist | $44.98 |
| 39 | 28.07.2021 | Screening for bedwetting | $26.02 |
| 40 | 28.07.2021 | Directions Zaporozhye, Vasilievka for medical needs of pupils | $40.88 |
| 41 | 28.07.2021 | Vision treatment | $48.32 |
| 42 | 28.07.2021 | Points for two pupils | $70.62 |
| 43 | 28.07.2021 | Examination by an ophthalmologist of 5 pupils | $55.75 |
| 44 | 09.06.2021 | Meals of wards | $14.78 |
| 45 | 16.04.2021 | Dental treatment for children DDST, travel to Vasilievka | $324.15 |
| 46 | 01.04.2021 | Компенсация стоимости дома, земли и взноса за газификацию дома | $198.82 |
| 47 | 18.03.2021 | Dental treatment under anesthesia for children living in DDST | $397.14 |
| 48 | 18.03.2021 | Dental treatment Sofia Sh. | $58.49 |
| 49 | 25.02.2021 | Baby sitter | $35.78 |
| 50 | 25.02.2021 | Dental treatment Ksenia O., travel | $143.12 |
| 51 | 04.02.2021 | Shelf for shoes | $35.72 |
| 52 | 04.02.2021 | Baby care | $71.44 |
| 53 | 06.01.2021 | Компенсация стоимости дома, земли и взноса за газификацию дома | $52.81 |
| 54 | 30.12.2020 | Pump repair | $17.69 |
| 55 | 26.12.2020 | Buying a sofa | $386.54 |
| 56 | 21.12.2020 | Compensation of expenses for connecting gas to the house | $72.11 |
| 57 | 21.12.2020 | Nurse for the ward DDST | $72.11 |
| 58 | 11.12.2020 | Dental treatment of ward Daria | $249.33 |
| 59 | 09.12.2020 | Home insulation | $29.84 |
| 60 | 12.11.2020 | Starting a gas boiler | $12.43 |
| 61 | 23.10.2020 | Home insulation | $155.67 |
| 62 | 23.10.2020 | Commission of the bank | $3.54 |
| 63 | 23.10.2020 | bank commission 10.2020 | $0.11 |
| 64 | 28.09.2020 | Travel assistance with family replenishment | $70.75 |
| 65 | 28.09.2020 | Building materials for house wall insulation 25 m2 | $176.88 |
| 66 | 28.09.2020 | bank commission 09.2020 | $0.07 |
| 67 | 04.08.2020 | connection of boiler, transportation | $72.62 |
| 68 | 23.07.2020 | bank commission 07.2020 | $0.08 |
| 69 | 10.07.2020 | Gas connection | $806.06 |
| 70 | 08.07.2020 | repair in the shower | $16.56 |
| 71 | 03.07.2020 | gas stove relocation, washing machine connection, boiler delivery | $39.74 |
| 72 | 03.07.2020 | registration of the house to the charity | $8.68 |
| 73 | 24.06.2020 | Zaporozhgaz (connection services) | $96.59 |
| 74 | 16.06.2020 | The gas-fired boiler is a double-circuit wall heat output of 23.5 kW. Horizontal wall pass kit | $72.49 |
| 75 | 16.06.2020 | The gas-fired boiler is a double-circuit wall heat output of 23.5 kW. Horizontal wall pass kit | $350.19 |
| 76 | 16.06.2020 | The gas-fired boiler is a double-circuit wall heat output of 23.5 kW. Horizontal wall pass kit | $14.64 |
| 77 | 16.06.2020 | bank commission 06.2020 | $0.07 |
| 78 | 25.02.2020 | update of technical documents for the house | $12.6 |
| 79 | 21.02.2020 | Curtains and cornices | $204.27 |
| 80 | 14.02.2020 | Компенсация стоимости дома, земли и взноса за газификацию дома | $81.7 |
| 81 | 14.01.2020 | paper wrok for gas connection | $20.98 |
| 82 | 27.12.2019 | Chimney Repair | $21.11 |
| 83 | 20.11.2019 | Компенсация стоимости дома, земли и взноса за газификацию дома | $206.58 |
| 84 | 08.11.2019 | Home improvement, satellite TV connection, tuner | $44.61 |
| 85 | 07.11.2019 | Accessories: hose 8 pcs, monocrane 2 pcs. | $45.14 |
| 86 | 07.11.2019 | bank commission 11.2019 | $0.06 |
| 87 | 07.11.2019 | Accessories: hose 8 pcs, monocrane 2 pcs. | $4.12 |
| 88 | 07.10.2019 | Payment to plumbers for repair of a shower, installation of boilers | $41.24 |
| 89 | 01.08.2019 | paints for wall, lamps | $124.58 |
| 90 | 26.07.2019 | Paint for walls - 28 l, Dye, 6 bulbs, delivery | $48.02 |
| 91 | 24.06.2019 | Payment for the preparation of a construction passport for the commissioning of the house number 4 (part 2) | $156.85 |
| 92 | 06.06.2019 | switch for internet access (home 4) | $7.58 |
| 93 | 17.05.2019 | Prepay 50% for registration of a building passport and house commissioning | $164.11 |
| 94 | 17.05.2019 | Cable - 50 m, call the wizard to connect to the Internet | $31.28 |
| 95 | 03.05.2019 | electricity | $9.98 |
| 96 | 25.03.2019 | Two-compartment refrigerator | $313.38 |
| 97 | 22.02.2019 | Payment for heating and electricity for December, February | $20.33 |
| 98 | 22.08.2018 | Contribution to the cooperative for gas connection | $2002.93 |
| 99 | 31.05.2018 | Wheelbarrow Repair | $9.57 |
| 100 | 08.05.2018 | repair of water pump | $11.4 |
| 101 | 04.05.2018 | Profile pipe in the range of 194 m, Rolling stock 50 m | $302.71 |
| 102 | 27.04.2018 | registration of ownership of land - registration of 2 sites | $19.44 |
| 103 | 12.04.2018 | garbage container 240 litres | $50.07 |
| 104 | 10.04.2018 | bars for fence + deelivery | $169.56 |
| 105 | 07.08.2017 | paint for the fence | $8.53 |
| 106 | 03.05.2017 | Installation of the pump for heating and ventilation | $38.04 |
| 107 | 05.12.2016 | Wardrobe 2 pcs | $71.74 |
| 108 | 09.08.2016 | Pipe metalplastic for a cable, electrogoods, cranes, etc. for connection of pump station | $34.23 |
| 109 | 03.08.2016 | The wire 3 * 1mm 60 m | $26.63 |
| 110 | 12.04.2016 | Installation of towel warmer and battery 2 pcs, water meter installation, Installation of booster pump, transport costs | $57.79 |
| 111 | 11.04.2016 | Compression nut 2 pcs, 8 pcs 90 Angle, Angle 45 6 pcs, American, 2 pcs pipe 25, Scotch, mineral wool 4 pieces, 6 pieces of rubber rings | $25.85 |
| 112 | 16.03.2016 | technical documentation for the house - paper work | $55.32 |
| 113 | 01.03.2016 | Installing electrical outlets 2 pcs, 2 pcs installation of mirrors | $7.38 |
| 114 | 25.02.2016 | Setting shell, soldering pipes, laying tiles, laying sewer pipes, installation of faucets, door installation, Installation of thresholds, installation of plasterboard, installation of casings 3 pcs | $164.32 |
| 115 | 25.02.2016 | Installing a toilet, shower tray installation, tiling, installation of electrical outlets | $27 |
| 116 | 22.02.2016 | LED lamps 7 pcs. | $21.97 |
| 117 | 11.02.2016 | Plasterboard 4 pcs, 2 pcs mix for tile, Liquid glass, Foam, mounting, Sheds, Tile | $58.06 |
| 118 | 09.02.2016 | heated towel rail for the shower | $32.42 |
| 119 | 09.02.2016 | toilet | $30.87 |
| 120 | 09.02.2016 | pan for the shower | $46.31 |
| 121 | 09.02.2016 | sink | $22.77 |
| 122 | 05.02.2016 | Installation of doors 2 units, plasterboard wall | $35.39 |
| 123 | 29.01.2016 | Plasterboard waterproof 2 pieces, mounting Profile 4 pieces, screws, adhesive tiles Cerezyme 2 pack | $26.88 |
| 124 | 18.12.2015 | Door white blank piece 2, door 80 cm., White Ludka | $85.15 |
| 125 | 18.12.2015 | Laying tiles, installation of the mixer in the shower, running water wiring soldering | $115.81 |
| 126 | 14.12.2015 | Equipment of the hatch, installation of OSB attic, laying of a heater, warming of cracks of a roof | $52.02 |
| 127 | 09.11.2015 | Blind area home: digging the soil; Fabrication and installation of the formwork; Concreting otmostki | $53.55 |
| 128 | 09.11.2015 | Resetting the gate, welding; Bricklaying - 138 pieces; Concreting of the pit; Concreting otmostki corner of the house; Ramps for the arrival in the yard | $46.57 |
| 129 | 04.11.2015 | Cement, polyurethane foam | $21.75 |
| 130 | 28.10.2015 | Installation of a flue. Installation of a heating copper. Installation of the heated towel rail in a bathroom. | $53.16 |
| 131 | 27.10.2015 | Cement | $17.72 |
| 132 | 21.10.2015 | Power saw chain | $89.21 |
| 133 | 20.10.2015 | Concreting of the yard and road to the house 100 кв м(work) | $373.99 |
| 134 | 16.10.2015 | Electrocable | $20.7 |
| 135 | 16.10.2015 | hydrometer | $40.19 |
| 136 | 09.10.2015 | Prepayment. Concreting Driveway | $234.75 |
| 137 | 06.10.2015 | Advance payment: construction work | $96.94 |
| 138 | 06.10.2015 | Advance payment: construction work | $96.94 |
| 139 | 29.09.2015 | Payment for heating, installation of heated towel rails | $18.53 |
| 140 | 16.09.2015 | jalousie (curtains) for windows, 15 pcs | $147.29 |
| 141 | 15.09.2015 | induction stove 1 place | $38.25 |
| 142 | 15.09.2015 | kitchen-sink | $53 |
| 143 | 20.08.2015 | preparing/cutting 2 kitchen tables | $17.22 |
| 144 | 20.08.2015 | legs 8 pcs for 2 kitchen tables | $46.22 |
| 145 | 20.08.2015 | Kitchen furniture 4 meters | $424.96 |
| 146 | 20.08.2015 | materials for windows 2nd floor, plasterboard | $19.76 |
| 147 | 14.08.2015 | Partial payment for heating installation | $186.95 |
| 148 | 05.08.2015 | Installing 2 doors | $18.93 |
| 149 | 29.07.2015 | plinth and equipment for it | $30.17 |
| 150 | 28.07.2015 | Drain tank: fill the hole between the plates, laying of roofing material, filling the earth, making the hatch assembly drawing | $45.3 |
| 151 | 28.07.2015 | Payment builders: Boarding railings, stairs, walls, closets, coat kitchen 21m?; installation of spotlights; Installation 5 chandeliers | $133.64 |
| 152 | 28.07.2015 | 2 tables for pupil | $50.77 |
| 153 | 28.07.2015 | Payment builders: Entrance hall: plaster, grout, 3 slope | $52.1 |
| 154 | 28.07.2015 | Delivery of doors, linoleum | $15.86 |
| 155 | 28.07.2015 | Payment builders: Installation of the floor of the long room 20 m?, 1.5 m? Binder sidewall | $27.18 |
| 156 | 28.07.2015 | Payment builders: Installation baguettes 120 lm, 145 lm sexual plinth | $95.59 |
| 157 | 27.07.2015 | Buying oilcloth on the table and a toilet for the children s camp s.Ukrainka | $1.46 |
| 158 | 22.07.2015 | Building materials: Electrodes, hardware, cranes, couplings, pipes | $34.18 |
| 159 | 22.07.2015 | Heating installation payment for work | $90.82 |
| 160 | 22.07.2015 | Delivery of building materials | $9.08 |
| 161 | 17.07.2015 | Children s Eco Village (transfer) | $219.08 |
| 162 | 17.07.2015 | equipment for bathroom | $74.4 |
| 163 | 09.07.2015 | Buying mosquito mesh for windows 14 | $133.22 |
| 164 | 08.07.2015 | Nails carpentry | $4 |
| 165 | 07.07.2015 | 4 blankets | $39.97 |
| 166 | 07.07.2015 | pre-payment for kitchen sofa 3,2*1,4 meters | $66.61 |
| 167 | 07.07.2015 | WI Fi router TP-LINK TL-WR843ND for Internet connection | $37.02 |
| 168 | 07.07.2015 | Delivery of building materials | $14.03 |
| 169 | 07.07.2015 | Purchase of building materials: pipes, cranes, couplings, cap, branch, electrodes | $110.19 |
| 170 | 06.07.2015 | Installation of ceiling hectoliters in the long room, plaster (21 m?) | $90.78 |
| 171 | 06.07.2015 | Dismantling of old pediment, installation under the tides on the facade gable 12 m | $37.11 |
| 172 | 06.07.2015 | Expansion 3 doorways, installing doors 9 | $135.6 |
| 173 | 06.07.2015 | Slopes in the kitchen, derailed in a new window in the bedroom, assembly room and bedroom slopes | $59.47 |
| 174 | 06.07.2015 | Installation of water under the sink in the kitchen | $7.14 |
| 175 | 06.07.2015 | Payment builders bedroom near the kitchen: floor filler, slopes of windows, Installation of window sills, door slope | $61.85 |
| 176 | 06.07.2015 | Materials: 70 meters plinth, 2 cans of paint pF for the long room, woodworm in the vestibule 3 MP, Extra pump | $141.64 |
| 177 | 06.07.2015 | Delivery of 6 beds | $16.65 |
| 178 | 06.07.2015 | Lamps one-point in the hall, kitchen, bathroom 32 pc. | $76.13 |
| 179 | 06.07.2015 | Equipment for the Internet, the installation of the antenna, mount fee for month | $155.11 |
| 180 | 06.07.2015 | polish 7,5 litres | $71.37 |
| 181 | 06.07.2015 | constructing and materials of 6 wooden beds | $242.65 |
| 182 | 06.07.2015 | baguetteы for ceiling 40 pcs * 2 m | $15.23 |
| 183 | 06.07.2015 | Kitchen: window sills, floor tiles, podstupok. Tile for the bathroom, vestibule, furnace. Freese toilet | $240.75 |
| 184 | 06.07.2015 | screws 2000 pcs | $13.32 |
| 185 | 06.07.2015 | polishing of 37,5 sq meters of the floor | $76.13 |
| 186 | 06.07.2015 | work: laying QSP plates 40 sq meters | $9.52 |
| 187 | 06.07.2015 | foam rubber 3 sheets 1,6*2meters for making 6 mattresses | $137.03 |
| 188 | 06.07.2015 | tabletop 3*0.8 meters for 2 kitchen tables | $140.02 |
| 189 | 06.07.2015 | pillows 8 pcs | $43.77 |
| 190 | 06.07.2015 | big radiator for bathroom | $89.54 |
| 191 | 02.07.2015 | tube 6 meters for Internet connection and television | $17.13 |
| 192 | 02.07.2015 | QSB building materials for 72 sq meters | $239.83 |
| 193 | 01.07.2015 | Delivery of accessories to system of heating | $4.76 |
| 194 | 01.07.2015 | Primer of ST of 17 - 5 canisters, glue for a facade of 1 piece, a brush, the roller, solvent, an emery paper | $51.89 |
| 195 | 01.07.2015 | Baguettes for the hall of 12 pieces | $15.71 |
| 196 | 01.07.2015 | Accessories to system of heating | $85.36 |
| 197 | 01.07.2015 | The pump for water; The Board for a threshold | $55.22 |
| 198 | 01.07.2015 | Pipe for an atena under the Internet of 6 m | $27.14 |
| 199 | 01.07.2015 | Grout Tile 4 bags | $21.9 |
| 200 | 01.07.2015 | Payment to builders: slopes 2 door and 4 window (2nd floor). Delivery of hard putty, paint, tables, USB, rack for the antenna, a swing, materials for a tennis table | $126.16 |
| 201 | 01.07.2015 | 8 sections of batteries for a toilet and the platform | $64.75 |
| 202 | 01.07.2015 | 2 telescopes for painting of a facade and ceilings | $13.33 |
| 203 | 25.06.2015 | Galvanized 4 m? | $18.49 |
| 204 | 25.06.2015 | Installation vestibule ceiling, beams, insulation, waterproofing, galvanized | $36.98 |
| 205 | 25.06.2015 | Installation facial pediment | $46.22 |
| 206 | 25.06.2015 | Installation and connection of the boiler, toilet, sink, sink fasteners | $46.04 |
| 207 | 25.06.2015 | Install handrails 9 MP | $29.12 |
| 208 | 25.06.2015 | Installation of electrical equipment, switches march, in the light of the long room, kitchen, vestibule, balcony | $83.2 |
| 209 | 25.06.2015 | Installation of ceilings of plastic in the bathroom, kitchen, bedroom, vestibule, toilet 45 м? | $104 |
| 210 | 25.06.2015 | Incandescent 10 pieces, 2 wheels and a camera under a wheelbarrow | $16.64 |
| 211 | 25.06.2015 | Pipes for railing 12m? | $24.96 |
| 212 | 25.06.2015 | Warming gorischa assembling polystyrene, sizing, installation Gidrobarer, 40 m? | $27.73 |
| 213 | 25.06.2015 | Linoleum 35 sq. meteres | $302.47 |
| 214 | 25.06.2015 | Paint 40 litres | $147.49 |
| 215 | 25.06.2015 | Payment builders: laying tile walls of the kitchen 14 м?, 10 м? frieze | $110.93 |
| 216 | 25.06.2015 | paints and brushes | $91.24 |
| 217 | 25.06.2015 | Skate, funnel gutter gutter 1 piece, 3 piece pipe strap wind, surcharge for gidrobarer, silicone gutter angles of 45 degrees under the gutter | $103.77 |
| 218 | 25.06.2015 | Window in the attic, additional payment for a window in the gable, installation, assembly foam bag results 2 | $61.01 |
| 219 | 25.06.2015 | Delivery of windows, sills, additional materials for the drain, tiles, smew | $18.49 |
| 220 | 25.06.2015 | Payment to the builders for installing drain 44 PM | $152.53 |
| 221 | 25.06.2015 | Single switch with illumination 10 pieces, wire and plug for the boiler | $30.74 |
| 222 | 25.06.2015 | Adhesive tape for the insulation of the attic 3 skein | $11.09 |
| 223 | 25.06.2015 | Friezes in the kitchen 5 pc | $2.08 |
| 224 | 24.06.2015 | painting walls and ceiling, 63 sq. meters | $27.73 |
| 225 | 24.06.2015 | painting heating tubes, removing garbage | $23.11 |
| 226 | 24.06.2015 | Linoleum 13 sq. meteres and furniture for it | $105.15 |
| 227 | 24.06.2015 | Pain for walls 10 litres | $38.13 |
| 228 | 24.06.2015 | Paint 30 litres for ceiling, 1 lustre, lamps, etc | $122.67 |
| 229 | 24.06.2015 | 5 lustres | $92.44 |
| 230 | 23.06.2015 | Grout Tile 4 pack | $20.52 |
| 231 | 23.06.2015 | Grid trowel 6 packs, crosses for tiles, sandpaper | $5.55 |
| 232 | 23.06.2015 | Delivery tie and gutters | $18.49 |
| 233 | 23.06.2015 | Ognebiozaschita | $20.11 |
| 234 | 23.06.2015 | Skate 2 pcs, 14 pcs Leader strap end 13 pc, 11 pc drainpipes, gutters fixing for 26 pieces, for fastening pipes 22 pcs | $202.68 |
| 235 | 23.06.2015 | Gidrobarer 1 roll of sheet polystyrene insulation for the ceiling | $212.62 |
| 236 | 23.06.2015 | Dormer window in front gable | $18.49 |
| 237 | 17.06.2015 | Advance payment for heating (2 pers.* 5d * 100 USD) | $47.49 |
| 238 | 17.06.2015 | Building materials, gasoline A-92_10l*19,00 for the delivery of construction materials | $32.05 |
| 239 | 17.06.2015 | Building materials, gasoline A-92_5,26l*19,00 for the delivery of construction materials | $105.25 |
| 240 | 16.06.2015 | Buy 3 plates; Delivery; Work Truck | $204.67 |
| 241 | 15.06.2015 | Forest for the pediment, vestibule, strengthening shed 0.54 m3 | $64.11 |
| 242 | 15.06.2015 | Delivery of materials 170km | $64.58 |
| 243 | 15.06.2015 | Hardware roof vestibule, plastic, pediment | $21.84 |
| 244 | 15.06.2015 | 2 lock-key into the bedroom and hall | $24.69 |
| 245 | 15.06.2015 | 10 sheets QSB | $113.97 |
| 246 | 15.06.2015 | Plastic kitchen, bedroom, bathroom | $196.12 |
| 247 | 15.06.2015 | Construction waste concrete and stones near the cellars and courtyard of 40 cubic meters. | $189.94 |
| 248 | 11.06.2015 | Materials for water (boiler start-up bathroom, toilet) taps, tees, angles to the wall 20 pieces, 15 pieces of polystyrene | $100.56 |
| 249 | 09.06.2015 | Delivery of building materials A-92 Gasoline of 15,26 l. | $13.74 |
| 250 | 09.06.2015 | Purchase of building materials for the sewerage | $104.73 |
| 251 | 06.06.2015 | paper work for the new building | $21.53 |
| 252 | 05.06.2015 | Finishing of a hall, corridor and bedroom on the first floor: plaster, hard putty, bulk floors, window sills, ceilings hard putty and installation of gypsum cardboard | $415.1 |
| 253 | 05.06.2015 | Finishing guest on the second floor: filing of walls of QSB, a hydrobarrier, installation of walls in a shower and a toilet on the second floor (155 sq.m) | $202.32 |
| 254 | 05.06.2015 | Electrician: switches, wire of 10 m, bulbs of 10 pieces | $22.72 |
| 255 | 05.06.2015 | Polyurethane foam, paint on metal, acryle, daggers for a tile | $32.42 |
| 256 | 05.06.2015 | Installation of two-Tauris for strengthening of a ceiling in kitchen and a bedroom: an ankereniye, cutting down of apertures, concreting, fastening to rafters | $47.33 |
| 257 | 05.06.2015 | Repair furnace, a bathroom, a toilet and a small corridor on the first floor: slopes, laying of a tile of walls and floor, filing of walls moisture protective gypsum cardboard, water supply system, installation of a bathroom and toilet | $422.86 |
| 258 | 05.06.2015 | Hard putty on an old brick of 42 sq.m. | $99.38 |
| 259 | 04.06.2015 | 9 inside doors | $368.99 |
| 260 | 04.06.2015 | Delivery of building materials A-92 Gasoline of 10 l. | $4.51 |
| 261 | 04.06.2015 | Delivery of a flue, doors, ceramic tile | $14.23 |
| 262 | 04.06.2015 | Purchase of building materials: Electrodes, carving | $11.67 |
| 263 | 03.06.2015 | Chimney | $279.35 |
| 264 | 03.06.2015 | ceramics fro kitchen and korridor, 40 sq. meters | $227.37 |
| 265 | 02.06.2015 | Installation of plasterboard ceilings, shpaklevka pod painting, plaster, primer 2 komnatы 2nd floor | $144.18 |
| 266 | 02.06.2015 | Construction gables lavatory naprotyv 5 sq.m. | $23.71 |
| 267 | 02.06.2015 | Edging frontonov and wool uteplenye 23 sq.m. | $70.9 |
| 268 | 02.06.2015 | Red Bricks lytsevoy in suspense for 104 pcs | $19.73 |
| 269 | 02.06.2015 | Installation metallycheskoy Stairways to 2nd floor | $142.28 |
| 270 | 28.05.2015 | Laying perestenkov in lavatory | $48.95 |
| 271 | 28.05.2015 | Materials for soldering water supply and sewage | $68.82 |
| 272 | 28.05.2015 | Installation Wooden floor 21 sq.m. | $119.98 |
| 273 | 25.05.2015 | additional payment for walls decorating | $10.08 |
| 274 | 22.05.2015 | Fan, Ventilation grille, hood extractor, Visor | $27.64 |
| 275 | 21.05.2015 | bank comission | $4.83 |
| 276 | 20.05.2015 | Materials: sewer pipes, profile 9m, nails 2kg. Crate to the roof. Rafters for gable and more for shelter. Crushed 4 tons | $256.11 |
| 277 | 20.05.2015 | Payment builders: Installation proprovodki, cutouts, 105 points | $263.31 |
| 278 | 19.05.2015 | Payment to the builders: the dismantling of the old roof; Installation Gidrobarer rafters, battens, slate, ridge ognebiozaschita (29.5 m?); Rearing overhang rafters for 75 m?; Installing racks martselata | $263.31 |
| 279 | 18.05.2015 | Payment to the builders: the dismantling of the old roof; Installation Gidrobarer rafters, battens, slate, ridge ognebiozaschita (29.5 m?); Rearing overhang rafters for 75 m?; Installing racks martselata (partial payment) | $191.08 |
| 280 | 18.05.2015 | Crate on the roof of a slate of 25 pieces | $44.69 |
| 281 | 18.05.2015 | Rubble 32 tons, delivery | $266.69 |
| 282 | 15.05.2015 | 30 tons of sand, Delivery | $271.98 |
| 283 | 15.05.2015 | Windows made of metal with the ebb 5 pieces | $310.83 |
| 284 | 14.05.2015 | Foam 3 cylinder. Hardware (screw 40 pc, 35 pc of the anchor plates 35 pcs). Diesel 20 liters | $51.82 |
| 285 | 14.05.2015 | Windows made of metal with ebbs 5 pieces: cutting openings for windows and installing | $70.42 |
| 286 | 14.05.2015 | Payment builders: Laying sewer 60 meters (on the street, from the kitchen, from the bathrooms, 2nd floor) | $101.99 |
| 287 | 13.05.2015 | Registration of the construction passport (advance payment) | $87.42 |
| 288 | 12.05.2015 | Payment BUILDER: plaster, mesh, alignment in the mud walls of the house (the advance) | $291.41 |
| 289 | 12.05.2015 | Payment builders: Plastered 2 bedrooms on the second floor of the annex; Bedding, filling, reinforcement, floor insulation in the bathroom of 12.5 m? | $132.83 |
| 290 | 08.05.2015 | The bedroom on the 1st floor of 42 m?; Delivery putty, glue, paint primer | $80.45 |
| 291 | 08.05.2015 | Delivery of cement; slate; lumber | $68.14 |
| 292 | 08.05.2015 | Hardware for the roof: 20 kg nails; screws 2000 units; | $66.72 |
| 293 | 08.05.2015 | 100 bags of cement; Slate 51 list | $480.38 |
| 294 | 07.05.2015 | Hire of reinforcing 180 m, grid of masonry 50 pieces, pipe of profile 72 m, m beam No.16 - 9,04m | $361.25 |
| 295 | 06.05.2015 | Payment builders: Dismantle of a wall of 5 m ?; rewall of 0,5 m ?; ovens; carrying out of garbage; floors in a bathroom; Hard putty of a wall of 27,3 m | $189.28 |
| 296 | 06.05.2015 | Payment builders: Sand pillow under the sewerage, a zasypka of a trench of 30 m | $42.59 |
| 297 | 06.05.2015 | Payment builders: Floors in a bedroom, a corridor, a drawing room of 44 m ? dismantle of whitewashing, old doorways, plaster, installation of a ceiling | $263.1 |
| 298 | 05.05.2015 | Payment builders: uteplenye, shpaklevka, priming, painting 130 m? facade. Windowed otkosы, dvernyj proemы 55 Stamp | $560.75 |
| 299 | 05.05.2015 | Payment builders: Installation Wooden floor 38.3 m?; vatы styling and hydrobarera 38.3 m?; installation of lying down and stoek pod lesnychnыy fly; | $302.38 |
| 300 | 23.04.2015 | Payment builders - 130 m? advance facade | $449.35 |
| 301 | 22.04.2015 | Uteplenye ceilings 2nd floor 73.8 m? (hydroyzolyatsyya). Hydroyzolyatsyya frontonov 40 m?, Installation skates. Podshyvka the roof slope. Corner perforyrovanыy 20 pcs. Clay IDK 3 dwelled | $88.97 |
| 302 | 22.04.2015 | Production of forest to Les (2) 2 pieces and stairways; formwork 0.5 m? | $51.68 |
| 303 | 22.04.2015 | Delivery of materials | $53.92 |
| 304 | 22.04.2015 | 170 hazoblokov; Slate 2 pieces; mauerlat | $164.82 |
| 305 | 20.04.2015 | Knee of sewer 3 pieces; Floors the self-leveled Siltek (25kg) - 30 bags; delivery | $114.95 |
| 306 | 16.04.2015 | Vapor barrier film 3 rudder; knee sewer | $53.3 |
| 307 | 10.04.2015 | bricks 1664 pcs | $265.42 |
| 308 | 10.04.2015 | 30 000 kgs of sand and 30 000 kgs of small stones | $374.3 |
| 309 | 10.04.2015 | Pre-payment for beams between floors | $346.66 |
| 310 | 09.04.2015 | Erection of skeleton gables; opening a window (frame); OSB sheathing; installation of two martselatov. Screws floor 680 pieces; Wool 40 m? | $219.56 |
| 311 | 09.04.2015 | Scotch 2 pieces; Nails 15 kg; Screws 3000 pcs; Corners 90sht; Blackboard 0.9 m?; Parobare 2 rudder. | $226.5 |
| 312 | 09.04.2015 | pipe 32 - 7m; coupling, corner 2sht; a pipe No. 25 - 8m | $13.7 |
| 313 | 07.04.2015 | Cement screeds 40 bags; Forest floor 2nd floor - 0.36 cubic meters and 1.26 cubic meters Floor (in the old house) | $222.98 |
| 314 | 07.04.2015 | OSB plate 20 pieces; Knauf 37 pieces; Gidrobarer 2pcs; Plaster karoed 21 mesh; Profile 108 pcs | $751.32 |
| 315 | 07.04.2015 | Molded floor (2nd floor of the old house) of 60 boards; delivery drywall | $414.73 |
| 316 | 07.04.2015 | Digging holes in the water. Delivery aerocrete, rockwool (2 pallet) Karoed | $55.3 |
| 317 | 07.04.2015 | Umbrellas facade 1000 pieces; Angle front with a mesh of 40 pcs | $86.77 |
| 318 | 31.03.2015 | Fabrication and installation of doors; dismantling the chimney cleaning brick and transfer of brick from the roof; disassembly well under water, cleaning brick, Prokopka under the pipe; Shipping wool facade Housing | $257.65 |
| 319 | 31.03.2015 | Grid plaster 330 sq.m, a mixture of PPS 30 pcs, mix for 30 pieces of insulation | $540.23 |
| 320 | 19.03.2015 | Cement to fill the entrance to the site and 84 of the bag. Delivery of cement 170 km. | $193.62 |
| 321 | 19.03.2015 | Wood for frame gable 10pcs * 6m. Hardware for the pediment: Area 80sht;, nails 10kg; screw 1000pcs | $139.87 |
| 322 | 16.03.2015 | Expanded polystyrene insulation for floors 1, annex, bathrooms 50 m? - 76 sheets; | $111.03 |
| 323 | 16.03.2015 | Materials on the pediments: QSB 9 sheets; Forest 0.3 m? | $160.99 |
| 324 | 16.03.2015 | Materials for shelter: 10 sheets of slate; Forest 0.8 m? | $136.01 |
| 325 | 16.03.2015 | Payment builders: the erection truss system; waterproofing and overlap 2 floors; the dismantling of the old roof slope; the overlap of the roof; installation of the ridge and slate | $111.03 |
| 326 | 12.03.2015 | Enamel paint for canopy-soil | $5.2 |
| 327 | 12.03.2015 | Payment builders: the erection truss system; waterproofing and overlap 2 floors; the dismantling of the old roof slope; the overlap of the roof; installation of the ridge and slate (partial payment) | $174.7 |
| 328 | 11.03.2015 | Payment builders: the erection truss system; waterproofing and overlap 2 floors; the dismantling of the old roof slope; the overlap of the roof; installation of the ridge and slate (partial payment) | $187.8 |
| 329 | 11.03.2015 | Pipe 60 m, 1 m band garechekatannaya Rental gorechekatanny 1 sheet | $147.7 |
| 330 | 10.03.2015 | Accessories for arrangement of the roof | $69.88 |
| 331 | 02.03.2015 | Trench drains under 20m. Preparation cushion floor 38м? | $112.82 |
| 332 | 25.02.2015 | Pipes and other materials | $178.28 |
| 333 | 24.02.2015 | Timber roof area, screws, nails | $231.88 |
| 334 | 24.02.2015 | Slate 20 sheets; Shipping slate, wood, cement; 0,6m? board; Fill jumpers; masonry gazoblokov | $249.81 |
| 335 | 23.02.2015 | Plastic windows in the vestibule 2 pieces; installation of windows and flashings; foam installation | $101.56 |
| 336 | 20.02.2015 | Caldron KST 18 termobar | $260.25 |
| 337 | 20.02.2015 | Fill Laying nets 1.12 m? and viscous reinforcing cage 27m; masonry Perestenko 2.3 m? | $50.8 |
| 338 | 16.02.2015 | Mineral wool TEHNOFAS (120h600h100) 125.28 m? | $518.47 |
| 339 | 13.02.2015 | Bathtub 1,7 meters | $64.11 |
| 340 | 13.02.2015 | Mixer-tap for the kitchen | $18.03 |
| 341 | 13.02.2015 | Mixer-tap for the bathrooom | $31.25 |
| 342 | 12.02.2015 | Mineral wool 181,44m? | $199.17 |
| 343 | 11.02.2015 | Radiator of aluminum 100 sections | $614.29 |
| 344 | 11.02.2015 | Surcharge for windows | $112.12 |
| 345 | 05.02.2015 | Box 3 pcs; Door 1 pcs_ partial payment | $509.3 |
| 346 | 03.02.2015 | Bathroom Set: CD; set washbasin cabinet with | $83.37 |
Happy Child foundation - effective help to the most needy children of the Zaporizhzhia region, Ukraine
They need help:
Our expenses in 2026
| 35 sick children | $12 389 |
| Medical equipment: | $414 |
| Humanitarian help: | $10 600 |
| To disabled children: | $9 318 |
| To orphans and poor children: | $4 910 |
| Tourism program: | $98 |
| Help to adults: | $2 994 |
| Service expenses: | $6 314 |
| Total sum of expenses: | $47 076 |
$7 518 581
donated since 2007



