| 1 | 02.10.2026 | Duryagin Oksana (Large Family) (transfer) | $256.22 |
| 2 | 16.09.2026 | Two bags of cement and jigsaw blades | $10.08 |
| 3 | 11.09.2026 | Evacuation (transfer) | $516.24 |
| 4 | 07.09.2026 | Support for Lilia Timofeeva foster family (transfer) | $245.44 |
| 5 | 04.09.2026 | Support for Lilia Timofeeva foster family (transfer) | $202.63 |
| 6 | 04.09.2026 | Plastic windows and doors (partial compensation) | $715.45 |
| 7 | 02.09.2026 | Evacuation (transfer) | $669.88 |
| 8 | 02.09.2026 | Bank comissions (transfer) | $3.35 |
| 9 | 02.09.2026 | Valves and tees for gas convector | $10.49 |
| 10 | 02.09.2026 | Used saxophone for the lessons of an orphan child, Sofia Sh. | $267.95 |
| 11 | 02.09.2026 | Travel to classes with a speech therapist and music for 2 orphans 09.2026 | $66.99 |
| 12 | 27.08.2026 | 4 connectors and tees for gas convector | $44.09 |
| 13 | 22.08.2026 | Swimming lessons in the pool, travel for 2 orphans | $15.69 |
| 14 | 22.08.2026 | Atomoxetine 40 (08-09.2026) | $102.3 |
| 15 | 15.08.2026 | Plastic windows and doors (partial compensation) | $738.28 |
| 16 | 05.08.2026 | A trip for children from a foster family to the lake (teaching children to swim) | $15.64 |
| 17 | 21.07.2026 | Cable | $34.96 |
| 18 | 01.07.2026 | Support for Lilia Timofeeva foster family (transfer) | $572.65 |
| 19 | 01.07.2026 | bank commission 07.2026 | $0.11 |
| 20 | 27.06.2026 | Paint, siding order, pool tickets for 2 foster children | $61.88 |
| 21 | 27.06.2026 | Cables, sockets, switches, RCDs | $134.45 |
| 22 | 20.05.2026 | Duryagin Oksana (Large Family) (transfer) | $339.71 |
| 23 | 13.05.2026 | Transportation for 2 foster children to the section and to the speech therapist | $61.4 |
| 24 | 13.05.2026 | Faucet with water heater, | $40.94 |
| 25 | 11.05.2026 | Support for Lilia Timofeeva foster family (transfer) | $609.05 |
| 26 | 11.05.2026 | Support for Lilia Timofeeva foster family (transfer) | $19.61 |
| 27 | 11.05.2026 | Support for Lilia Timofeeva foster family (transfer) | $273.63 |
| 28 | 28.04.2026 | OSB 20 sheets and 4 meshes for blind area | $315.27 |
| 29 | 28.04.2026 | 4 sheets of corrugated board 2*1.2 m (toilet) | $70.31 |
| 30 | 28.04.2026 | board 0.5 m3 | $113.41 |
| 31 | 28.04.2026 | Delivery of building materials | $34.02 |
| 32 | 27.04.2026 | Plastic trash can | $47.72 |
| 33 | 27.04.2026 | Atomoxetine 40 (May 2026) | $56.59 |
| 34 | 13.04.2026 | Duryagin Oksana (Large Family) (transfer) | $338.99 |
| 35 | 31.03.2026 | Atomoxetine 40 (April 2026) | $58.23 |
| 36 | 31.03.2026 | Travel to training and music for foster children | $54.8 |
| 37 | 05.03.2026 | Transportation for 2 foster children to the section and to the speech therapist | $45.75 |
| 38 | 05.03.2026 | Atomoxetine 40 | $56.61 |
| 39 | 15.02.2026 | Support for Lilia Timofeeva foster family (transfer) | $1104.61 |
| 40 | 13.02.2026 | Delivery of uninterruptible power supply devices | $116.3 |
| 41 | 27.01.2026 | bank commission 01.2026 | $2.93 |
| 42 | 27.01.2026 | Support for Lilia Timofeeva foster family (transfer) | $231.88 |
| 43 | 27.01.2026 | bank commission 01.2026 | $5.8 |
| 44 | 27.01.2026 | Sheludko foster family (transfer) | $231.88 |
| 45 | 26.01.2026 | Support for Lilia Timofeeva foster family (transfer) | $69.54 |
| 46 | 26.01.2026 | Transportation of children from foster families to the section and to the speech therapist for January 2026. | $27.82 |
| 47 | 26.01.2026 | Equipment delivery | $4.64 |
| 48 | 26.01.2026 | bank commission 01.2026 | $8.81 |
| 49 | 26.01.2026 | Gas and CO sensors - 3 pcs. | $69.54 |
| 50 | 26.01.2026 | Dispipe 15 gas pipe in a casing - 16 m, connectors, tee, taps | $180.81 |
| 51 | 26.01.2026 | 2 gas convectors ATEM 3 kW. | $458.98 |
| 52 | 26.01.2026 | bank commission 01.2026 | $1.46 |
| 53 | 26.01.2026 | Medication: Atomoxetine 40 for February 2026 | $55.63 |
| 54 | 20.01.2026 | Support for Lilia Timofeeva foster family (transfer) | $189.29 |
| 55 | 03.01.2026 | Atomoxetine 40, 28 tablets. | $54.07 |
| 56 | 26.12.2025 | Support for Lilia Timofeeva foster family (transfer) | $281.62 |
| 57 | 20.12.2025 | Metal-plastic doors for a foster family | $250.37 |
| 58 | 01.12.2025 | Prepayment for metal-plastic entrance doors | $189.28 |
| 59 | 01.12.2025 | Transportation for 2 foster children to the section and to the speech therapist | $52.05 |
| 60 | 01.12.2025 | Shushmintseva Sofia (Foster child) (transfer) | $29.55 |
| 61 | 08.11.2025 | Support for Lilia Timofeeva foster family (transfer) | $34.08 |
| 62 | 05.11.2025 | Transportation for 2 foster children to the section and to the speech therapist | $47.54 |
| 63 | 04.11.2025 | Support for Lilia Timofeeva foster family (transfer) | $28.07 |
| 64 | 07.10.2025 | Fuel 55.90 * 38.57 l. (travel to the music and football sections of two foster children) | $49.82 |
| 65 | 23.09.2025 | Sheludko foster family (transfer) | $424.24 |
| 66 | 23.09.2025 | Support for Lilia Timofeeva foster family (transfer) | $312.94 |
| 67 | 23.09.2025 | bank commission 09.2025 | $4.23 |
| 68 | 13.09.2025 | Fuel 52,50 * 40,0 liters. (Travel, music and football sections for orphans) | $50.83 |